“Our special thanks go to Jörg Wüstner from the Grimm engineering office, who planned the entire project and was in charge of site management, and Gerhard Schacht from the city administration, who always provided us with advice during the planning and execution phases. We would like to thank all those involved in the construction, the employees of the city administration and the Crailsheim public utility company for the smooth collaboration over the past few months,” underlines Ralf Schubert, managing partner of Gerhard Schubert GmbH. “To implement such an extensive construction project in such a short period of time only works if all partners pull together. With a height of 3.5 metres, it will reduce noise emissions to the residential area. A further part of the construction work is the enlarged noise protection wall with noise barrier to the Kreuzberg residential area. The construction contract also includes extensive ecological equalisation measures, such as 35 newly planted trees. For comparative purposes: The same time span is required to build a TLM packaging machine from Schubert. And all this in a record-breaking net construction time of only about 20 weeks. As soon as the economic situation has stabilised after the corona crisis, additional assembly areas and offices for up to 300 new employees are to be built over the next few years.ĭuring the road construction work, for which the Satteldorf-based construction company Leonhard Weiss is responsible, some 15000 cubic metres of soil material were moved. On 860 metres, the road and the cycling path were moved about 100 metres to the north in order to free up space for the planned site expansion of the steadily growing Gerhard Schubert GmbH. Six months ago, almost to the day, the ground-breaking ceremony for the relocation of the L2218 took place on 8 October 2019. “With the successful and very rapid relocation of the state road, we have now created the prerequisites for our site expansion on the newly acquired areas,” says company founder Gerhard Schubert with satisfaction. Nonetheless, the Crailsheim-based company is delighted that the construction project has been completed. Of course, the coronavirus pandemic (COVID-19) does not allow this at present. Actually, the opening of the newly built road section of the L2218 should have been celebrated on 9 April with a small celebration for the employees involved in the planning and the management of Gerhard Schubert, as well as all those involved in the construction and representatives of the city administration.
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |